StoppingClimateChange.com                                                                          3a,  Pilot Plant Power Drop
Home Page     Sitemap      About      Foreword     Oil 2.0     Cheaper Than Coal?      The Technology      Footnotes & Links

Site Facilities:     1  Unneeded Old Coal Power Plant      2  New Power Plant Building       
Power Plant:       3  Power Plant Choices    3a  Pilot Plant Power Drop  CCS:  3b  Natural Gas    3c Hybrid CO2  Nuclear:  3d  GA 1,560F    3e  NuScale 550F    3f  ThorCon 1,300F    3g  Terrestrial  1,300F 

Fuel Feedstock:  4  Hydrogen and Steam Generators      5  Biomass Preparation      6  Plasma Torch Biomass Gasifier     
Refinery:             7  Biosynfuel Refinery      8 Biosynthetic Fuels     
8a Cellulosic E85 BioEthanol     8b Cellulosic M70 BioMethanol     8c Cellulosic BioDiesel     8d Green Hydrogen

What:
Where:
When:
Why: 
How:

   
Pilot Plant Power Drop

3a  Pilot Plant - To Power A 1/5 Scale Carbon-neutral Fuel Manufacturing Technologies Plant To Optimize Facilities 4, 5, 6, 7, 8

This is a 50 megaWatts drop - Should be enough electricity for a small pilot Energy Park.

For starters, you could buy only electricity from nuclear reactor power plants so your process energy would be 100% clean.

 

 

________________________________________________________________

Footnotes & Links

The unneeded power plant your author has in mind is a small single unit coal power plant located over a prime Carbon Capture disposal strata in Michigan.

 

________________________________________________________________

This website is a draft. The candidate document's footnote numbers go with a private database. Copy the document's title and submit it to Google. The document may still be posted on the Internet.

________________________________________________________________